Blog Archive: January 2013 — Design & Development Notes
By Daniel Mercer · Published · 5 min read

This archive collects the design and development posts we published in January 2013, when responsive layouts were moving from novelty to default and clients started asking why a site looked different on a phone than on a laptop. The advice here has been revisited since, but the underlying questions — how much to spend, how long a build takes, what performance actually costs — are the same ones we answer every week.
Each entry is written for the person signing off on a website rather than the person coding it. Expect plain numbers, sensible ranges and the trade-offs behind them, so you can hold a budget conversation without needing a glossary. Where our thinking has moved on, the linked guides carry the current version.
Why responsive layouts became the default in 2013
By early 2013, phone traffic to small business sites had climbed into the 20–35% range for most of the projects we tracked, and it was still rising quarter on quarter. That number alone killed the argument for a separate mobile site for most small businesses: two codebases, two content updates, two sets of bugs. A single fluid layout with a few breakpoints was cheaper to run and easier to keep accurate.
The practical catch was that responsive design is not a checkbox. A layout that reflows badly — tiny tap targets, tables that overflow, images that push text off-screen — is worse than a plain single-column page. We started every January project with the narrowest view rather than the widest, which forced content priorities to the surface early. That habit is still the one we would keep if we could keep only one.
Budgets in that period typically landed between £2,500 and £8,000 for a brochure site with five to ten pages, and responsive work added roughly 10–20% on top of a fixed-width build. That premium has largely disappeared now that fluid layouts are standard, but the discipline of testing on a cheap Android handset before sign-off has not. It catches more real problems than any emulator.
- Design the smallest screen first
- Set breakpoints from content, not device names
- Test on a real low-end phone
- Keep tap targets at least 44px
Page weight: the quiet performance problem
Average page weight for the sites we audited in January 2013 sat around 1.2–1.8MB, with images accounting for 60–70% of that. A handful of homepages passed 3MB, usually because a hero carousel loaded five full-width photographs at once. On the office fibre connection nobody noticed; on a 3G phone the same page took eight to twelve seconds to become usable.
The fixes were unglamorous and cheap. Compressing images properly, dropping the carousel to a single static hero, and deferring anything below the fold typically cut 40–60% of the weight in an afternoon. None of it required a redesign, and all of it improved how fast the page felt. We still open a conversation about performance with image weight, because it is the largest lever most sites have.
It helps to frame speed as a business cost rather than a technical score. If a slow page costs you a measurable share of enquiries, the fix pays for itself quickly. For a plain-English walk through the figures, see Core Web Vitals: What the Numbers Mean for Small Sites.
What a build actually takes, week by week
Clients in January 2013 were consistently surprised by timelines, so we started publishing a week-by-week breakdown with every quote. A ten-page brochure site with a contact form and basic content management typically ran six to ten weeks from kickoff to launch, assuming content arrived on schedule. Content, not code, was the usual delay: two to three weeks of silence after the first draft was common.
The pattern has not changed much since. Discovery and structure take one to two weeks, design one to three, build two to four, and testing plus launch one week. If photography or copywriting is part of the scope, add two weeks. A tight deadline usually means cutting scope, not compressing testing — the last week is where broken forms and missing redirects get caught.
We now spell this out before contracts are signed, because an honest schedule prevents most of the friction in a project. The current version of that breakdown lives in How Long Does It Really Take to Build a Business Website?.
Hosting decisions small businesses get wrong
The hosting question came up in nearly every January kickoff, and the honest answer was usually shared hosting for a five-page site with modest traffic. Shared plans ran £4–£15 a month; managed hosting started around £30–£80 a month and climbed steeply with resources. The difference matters when you need staging environments, daily backups and someone to call at 9pm, not for a brochure site.
Where people went wrong was buying managed hosting to solve a performance problem caused by a heavy theme, or choosing the cheapest plan and then wondering why the site fell over during a local press mention. Match the plan to traffic and to how much of the maintenance you want to handle yourself. If you have no technical contact and your site takes enquiries, the higher tier is usually worth it.
We put the trade-offs side by side in Shared vs Managed Hosting: Which Fits a Small Business?, including the questions worth asking before you commit to an annual contract.
Browser testing without the sprawl
In January 2013 the testing matrix still included Internet Explorer 8 for a meaningful slice of visitors, mostly in offices and schools. We checked analytics before every project rather than testing everything: if a browser accounted for under 2% of sessions and the layout degraded gracefully, it got a functional check and nothing more. That saved days per project.
The rule we settled on was simple. Test fully in the two or three browsers that carry most of your traffic, check the rest for readable content and working forms, and stop there. Pixel-perfect parity across every combination is not a realistic goal and clients rarely want to pay for it once they see the cost.
Graceful degradation is the safety net. Semantic markup, sensible fallbacks for fonts and images, and forms that submit without scripting will keep an old browser usable without a single extra hour of testing.
Content and photography on a small budget
The single biggest quality gap between a £3,000 site and an £8,000 site in that period was rarely the code — it was the words and pictures. Stock photography was recognisable and often worked against trust. A half-day with a local photographer, typically £250–£600, produced images that made a small business look established and gave the designer something real to lay out.
Copy was the harder sell. Most owners wrote their own homepage text at the end of the project, under time pressure, and it showed. A structured brief with three questions — who are you talking to, what do they need to know first, and what should they do next — improved drafts more than any style guide. Budget £300–£800 for an editor if writing is not your strength.
We now build content workshops into the schedule rather than treating copy as an afterthought, and it shortens projects rather than lengthening them.
Budgeting for a landing page
Campaign landing pages were a frequent January request, usually tied to a print advert or a trade show. A single focused page with a clear offer, a short form and basic tracking ran £400–£1,200 depending on design complexity and how much copywriting was needed. Pages built from an existing template sat at the bottom of that range.
The costs that surprise people are the ongoing ones: copy variants for A/B tests, form integration with a CRM, and tracking that survives a cookie consent banner. A page is cheap to build and expensive to run badly, so plan for two or three iterations rather than treating launch as the finish line.
The full cost breakdown, including what pushes a page toward the top of the range, is in How Much Should a Landing Page Cost?.
| Item | 2013 typical range | Current typical range | Notes |
|---|---|---|---|
| 5–10 page brochure site | £2,500–£8,000 | £3,500–£12,000 | Responsive now standard, not an add-on |
| Responsive design premium | +10–20% | Included | Fluid layouts are the default |
| Average page weight | 1.2–1.8MB | 2.0–2.8MB | Images still dominate |
| Shared hosting | £4–£15/month | £5–£20/month | Fine for low-traffic brochure sites |
| Managed hosting | £30–£80/month | £40–£150/month | Worth it with staging and backups |
| Half-day local photography | £250–£600 | £350–£900 | Biggest quality lever per pound |
- Responsive layouts are standard practice now, but designing the smallest screen first still prevents most launch problems.
- Image weight remains the largest and cheapest performance lever on a typical small business site.
- Publish a week-by-week schedule with every quote; content delays, not code, cause most overruns.
- Match hosting tier to traffic and maintenance appetite rather than to marketing copy.
Daniel writes about planning and budgeting web projects for small and mid-sized businesses. He focuses on turning vague requirements into clear scopes and realistic timelines. His articles emphasize practical tradeoffs over hype.

