Most website projects run late for predictable reasons: unclear scope, slow content, and approvals that sit in someone's inbox for a week. Knowing what each phase actually involves makes it far easier to set a launch date that holds and to spot trouble early.
Below is how a typical small-to-mid-sized business site moves from kickoff to launch, with realistic durations for each stage, a comparison of project types, and the factors that most often stretch a schedule. Figures are working ranges from agency practice, not guarantees.
Phase 1: Discovery and Planning (1–3 Weeks)
Discovery is where the project is defined: business goals, audience, competitor review, sitemap, and a content inventory of what exists and what must be written. On a small site this can be a handful of workshops and a written brief; on a larger one it includes stakeholder interviews and analytics review. Skipping this phase feels faster but usually costs more later, because scope arguments surface during design instead of before it.
The main output is a signed-off scope: page list, functionality, integrations, and who supplies what. Expect 1–3 weeks depending on how many decision-makers are involved. If your organisation needs several approval layers, add a week here rather than discovering it during design. This phase also sets the technical direction, which is where a decision like choosing between WordPress and a static site generator gets made.
- Outputs: brief, sitemap, content inventory, scope document
- Typical duration: 1–3 weeks
- Client time needed: 4–8 hours of workshops and review
Phase 2: Content and Information Architecture (2–6 Weeks, Often in Parallel)
Content is the single most common cause of delay. Text, images, product data, and legal pages rarely arrive on schedule, and design cannot be finalised around placeholder copy without rework. A realistic rule: allow 2–6 weeks for content, and start it during discovery rather than after design sign-off. Pages with heavy imagery or regulated claims take longer.
Information architecture runs alongside: grouping pages, defining navigation, and planning URL structure. This matters for existing sites, since changing URLs without a redirect map is how rankings get lost. If you are rebuilding an established site, plan the redirect work here rather than at launch, as covered in planning a redesign without losing rankings.
- Start copywriting in week one, not after design
- Assign one content owner on the client side
- Plan a redirect map early if URLs will change
| Project type | Discovery | Design | Build & QA | Total |
|---|---|---|---|---|
| 5-page brochure site | 1 week | 2 weeks | 2–3 weeks | 5–7 weeks |
| 10–15 page business site | 1–2 weeks | 3 weeks | 3–4 weeks | 8–11 weeks |
| E-commerce, 50–200 products | 2–3 weeks | 4 weeks | 6–8 weeks | 14–18 weeks |
| Booking or member portal | 2–3 weeks | 4–5 weeks | 7–9 weeks | 16–20 weeks |
| Redesign with CMS migration | 2–3 weeks | 3–5 weeks | 6–8 weeks | 14–19 weeks |
| Multilingual corporate site | 3 weeks | 4–5 weeks | 7–9 weeks | 17–21 weeks |
Phase 3: Design (2–5 Weeks)
Design usually moves in two passes: a homepage or key-template concept, then the remaining templates once the direction is approved. For a brochure site of 8–15 pages, 2–4 weeks is typical; e-commerce or multi-service sites with many templates run 4–6 weeks or more. Each round of feedback should be consolidated by one client contact, because conflicting comments from five people can add a week per cycle.
Two things stretch this phase: late changes to page structure and requests for pixel-level revisions on every screen. Agreeing at kickoff which pages get bespoke design and which reuse templates keeps effort proportionate. Mobile layouts should be designed alongside desktop, not after, which is why a mobile-first approach tends to shorten rather than lengthen the schedule — see what mobile-first means in practice.
- Allow 2–3 feedback rounds, consolidated by one contact
- Design mobile and desktop together
- Lock page structure before visual design starts
Phase 4: Build and Integration (3–8 Weeks)
Development time scales with template count and integrations. A 10-page marketing site with a contact form typically takes 3–4 weeks; adding e-commerce, a booking system, CRM sync, or a multilingual setup pushes this to 6–8 weeks. Content entry is often folded in here, and it is worth budgeting it explicitly — entering 30 pages of copy and images is a day or two of work, not an afternoon.
Quality assurance belongs in this phase, not after it. Test on real devices, check forms and payment flows end to end, and run performance checks before launch. Core Web Vitals thresholds are easier to hit when measured during build than patched afterwards; if performance targets are part of the brief, review them here rather than the week before go-live.
- Simple marketing site: 3–4 weeks
- With e-commerce or bookings: 6–8 weeks
- Include device testing and a performance pass before sign-off
Phase 5: QA, Launch, and Post-Launch (1–2 Weeks)
The final stretch covers cross-browser and accessibility checks, redirects, analytics and tracking setup, DNS changes, and a launch-day checklist. Allow 1–2 weeks. Launch on a Tuesday or Wednesday morning rather than a Friday afternoon, so problems get fixed while the team is available. Keep a rollback plan and a named person on call for the first 48 hours.
Post-launch work is real work: monitoring errors, checking search console for crawl issues, fixing broken links, and gathering early feedback. Budget a light retainer or a fixed support window for the first month. Accessibility fixes in particular are cheaper now than after a complaint or audit — a short pass against a checklist catches most issues.
- Launch midweek, not before a weekend
- Verify redirects and tracking on day one
- Plan a 30-day post-launch support window
- A typical 10–15 page business site takes 8–11 weeks; content delays are the biggest risk.
- Start copywriting in week one and name a single content owner.
- Add 4–8 weeks for e-commerce, bookings, or CMS migrations.
- Launch midweek with a rollback plan and 30 days of support.
Design and UX writer
Rachel covers interface design, accessibility and mobile usability for business websites. She has spent years helping teams simplify cluttered sites into clear, usable experiences. Her writing favors checklists and concrete examples.


